For a Turkish project buyer discussing an EV OEM ODM factory, equipment acceptance should be planned before an order is signed. The aim is to agree what will be delivered, how it will be checked and who must resolve any gaps. This is a project-planning guide; it does not establish that any equipment meets a specific standard.
Define the scope of supply
Build an equipment register with the manufacturer, model, quantity, intended assembly operation, electrical requirements and included tooling. Record whether installation materials, commissioning, manuals, training and spare parts are included. Ask for drawings and a list of site services the equipment needs before shipment.
Set observable acceptance criteria
For each item, agree who inspects it, where the inspection occurs and what evidence is required. Separate visible condition, completeness, electrical safety checks and a demonstration using an agreed representative workpiece. Specify who provides utilities, consumables and trained operators. Avoid accepting an unqualified production-capacity promise as the sole test.
Document shipping and installation responsibilities
Compare the equipment register with the packing list, invoice and shipping documents. Record package dimensions, lifting points and handling instructions. The U.S. Commercial Service’s Türkiye import documentation guide provides an overview; a Turkish customs specialist should confirm the current requirements and applicable conformity rules for each machine.
Close issues before handover
Use an issue register with an owner, remedy, evidence and completion date. Obtain approved operating procedures, maintenance instructions, a parts list and training records. Agree who signs the handover and how unresolved items will be handled.